And we have a loooooooooooooooong list of stuff to get accomplished.
- Beam the house and crank it back up so the middle of the house is once again level
- Remove boiler from the basement, so 1. it's finally out and 2. we can finish the above project
- Paint the entryway, stairway, and upstairs hallway (all one color)
- Redo trim/woodwork of said above rooms (getting old paint off edges of stained woodwork downstairs & making and staining upstairs woodwork)
- Shingling - to be done the first week of May or so... this is going to s.u.c.k., a 12-12 pitch and lots and lots of angles
- Move the laundry room upstairs (house must be level 1st), which means removing plaster & lath, then sheetrocking and plumbing everything in (C's territory) - complete redo
- Bathroom remodel. This is fallign apart as we speak. A new tub is an absolute must at this point, and as long as we are doing this we might as well do it all.
- Pull up carpet in the to be pool table room (aka the parlor), get the fabulous wood floor refinished so the pool table can be moved in. Remove extra non-used door, patch wall and paint the whole room. Get the added in closet door to match all the other woodwork (?)
- Also remove carpet and linolium from entryway. Get this wood floor and dining room floor refinished.
And I'm sure there is more... but this is a good start, impressive huh?
And some pictures of our progress:
And the new beam and support in place!
Chris putting up the other end of the beam & apparently cranking it really hard. To the far left you can see the temporary support in place where the old support stood on this side of the basement.